Loading Events

In partnership with Washington PTAC, Kiewit is looking to solicitate quotes on the upcoming Coastal 29 Fish Bundle Project for the listed items:

FOM (Fully Operated & Maintained) Equipment
– Trucking (Solo, T&T, Side Dump)
– Vac Truck
– Water Truck
– Sweeper Truck

Permanent Material Suppliers
– Aggregate
– Cable Fence Supply
– Concrete
– Geotextile
– Grout
– Large Woody Material
– Lumber – Lagging
– Pile Supply (Steel & Timber)
– Pipe
– Signage

Small Tools & Supplies
– Diversion Pump System
– Green Waste Grinding
– Temporary Erosion and Sediment Control
– Temporary Shoring (Street Plates, Shoring Boxes, Etc)
– Dump Sites (Dirt, Concrete, Asphalt, Green Waste)
– Traffic Control Supplies

Subcontractors
– Barrier
– Concrete Pumping
– Cranes
– Dewatering
– Drilling
– Fish Exclusion
– Guardrail
– HMA Paving
– HMA Planing
– Landscaping
– Logging
– Pigmented Sealing
– Rebar
– Stripilation
– Welding

Join us for a workshop to meet representatives from Kiewit and discuss this upcoming opportunity.

What: Live, in-person “Meet the Prime” workshop (Meeting will also be available virtually via Zoom)
Location : Aberdeen Timberland Regional Library
Date : March 21 2023 – Tuesday
Time : 10:00 – 11:30 AM

Share This Story, Choose Your Platform!